The concrete bridge was constructed to substitute 40 years old Gammon bridge located at Barikot over River Swat which had swept away during the 2010 flash-floods. UAE Government financed the reconstruction of bridge.
Fact Check:
- Commenced : 2011
- Completed : 2012
- Length : 328 m